Tag

J1772

Browsing

Launching last night in downtown Los Angeles, the 2012 Brammo Empulse R & 2013 Brammo Empulse broke their cover and officially debuted. Right off the bat from the designations, you can see that Brammo intends for the Empulse R to be a 2012 model, with the base model Emuplse coming out next year (more on that further down). As we expected, the Brammo Empulse R got quite the price bump after its 22-month marination, and will be $18,995 MSRP. Meanwhile when the Brammo Empulse becomes available next year, it will have a slightly more palatable $16,995 price tag.

Featuring a six-speed gearbox the Brammo Empulse R comes with a 54hp motor, 10.2 kWh battery pack (9.31 kWh nominal), and a bevy of brand-name components like Marchesini wheels, Brembo brakes, Marzocchi forks, a Sachs rear shock, and a few carbon pieces (read the full technical specifications here). Getting a revised look, the basic Empulse design is still there with some subtle changes (some for the better, some of the worse, in our humble opinion). Touting 56 highway miles and 120 city miles, the Empulse is going to suffer from the same range-limiting use that other electric bikes on the market are facing, though Brammo has thought to include J1772 Level 2 capability on the bike, which should make for some more rapid charges away from the mothership. We like that.

Fresh off its latest $2 million fundraiser, we get more news from Zero Motorcycles, as the Santa Cruz, CA company has released its 2011 line of electric motorcycles. Immediately noticeable is new livery and color schemes, but we think it’s the technical changes that will get people truly excited. Most prominant in the model year unveiling is the fact that every bike in Zero’s 2011 line-up can have a quick-charge option installed.

A major highlight, the quick-charge system will allow Zero Motorcycles with the add-on feature to be charged in nearly half the time of the standard version. Also a part of this technology’s allure is the ability for Zero Motorcycles to be charged off the J1772 public charging stations, which municipalities are starting to install in public parking spots.